News

Sayer Civil visit BAUMA 2013 Worlds Largest Construction Show

Graham & Travis Sayer attended the 7 day BAUMA 2013 International Construction Show in Munich, Germany.  Held every 3 years, BAUMA is the largest trade show in the World for the construction industry and is held in an area about the

Posted in News

Maleny Community Centre Redevelopment

Our role in the Maleny Community Centre major redevelopment involved the partial closure of Maleny’s main street, to enable underground water & drainage to be re-located as well as new kerb and bitumen laid. Preliminary works included the careful removal

Posted in Projects

McDonalds Restaurant Burpengary

McDonalds Restaurant Burpengary Value: $600,000+ This site beside Burpengary Creek required almost 6,000m3 of flood compensatory earthworks to offset the loss of flood storage volume, due to site filling. Works also included almost 5,000m3 bulk excavation and 5,000m3 of imported material

Posted in Projects

ability to adapt to and also suggest higher quality solutions

Landershute to Maleny Pipeline Project – Roadworks I would like to take this opportunity to thank you and your employees for the high quality of work that was completed on the Maleny Pipeline Project. The professional manner in which this

Posted in Testimonials

It is readily apparent that he is a man of considerable integrity.

Ballinger Park Estate & Remedial Works Stage 1 These were very difficult jobs due to adverse latent site conditions, existing residents requiring constant access, demanding property owners and work area access constraints.  Graham handled the various demanding tasks with aplomb,

Posted in Testimonials

Maleny Grove Retirement Village

ghgfhfdh

Maleny Grove Retirement Village:  Value $2,281,000 This exciting new development for Live Life Villages consists of bulk earthworks, roadworks, water, sewer and stormwater reticulation incorporating 7 underground rainwater harvesting tanks, ranging in size from 18,000Lt up to 81,000Lt.  

Posted in Projects

Cloudwalk Estate

Cloudwalk Estate

Rural Residential Estate $1,000,000+ This hillside project included bulk earthworks comprising of 47,100m3 cut to fill with compaction to Level 1, sewer, water & stormwater reticulation, ECOSOL Unit, 360m2 rock retaining walls and a retention basin. Value: $1,000,000+

Posted in Projects

Maleny Pump Station

Maleny Pump Station

Augmentation & Rising Main Value: $1,000,000+ The upgrade for the Sunshine Coast Regional Council included the construction of over 2 kilometres of pressure rising main in 280mm dia. HDPE polythene pipe with electrofusion & butt welding of joints. A key component

Posted in Projects

Kalana, Caloundra

Kalana

Road Widening  In close proximity to Meridan Schools, busy Kalana Road was widened using 1800 x 1500 & 1200 x 900 concrete culverts on concrete slabs. Over 300m of pavement and installation of guardrail and traffic islands were constructed. Traffic

Posted in Projects

Chancellor Park Estate

Chancellor Park

Stage 18e & Key Site 1 – 38 Lots  A residential development on behalf of AV Jennings, bordering Mooloolah National Park waterway. This 38 Lot development with all services, involved importing 13,400m3 of fill, compacted to Level 1, stormwater infiltration

Posted in Projects